Jedi Hotelier
"My pleasure"
She handed the very same list of directions to [member="Tanaski Yumi"] as she did with every overflow guest she sent to the Gaslamp Hotel due to a lack of vacancies, starting with the hotel's main entrance: take Bossk Avenue eastbound and then turn right on Glumack Drive; somewhere on that stretch of Glumack Drive, the Gaslamp Hotel sign will show up on the left if Tana continued to go in that direction. Plus it's on the corner of an intersection. Let's hope that the Gaslamp isn't full, sometimes it can be, but the Gaslamp is much, much larger than the Crown Nebula will ever be, even with all six floors I'm permitted thanks to the municipal ordinances not permitting buildings more than 20m high for commercial property, she thought, realizing the Crown Nebula will feature at most 106 rooms at this rate, but the most likely figure will be somewhere in the 90-100 room range when all six phases are completed, and the gourmet restaurant terracing would probably require two floors of terracing at that stage, with two more floors of terracing for the bar on top of it, expecting the overflow rate to decrease somewhat in the future and maybe the occupancy rate once there are enough rooms.
She handed the very same list of directions to [member="Tanaski Yumi"] as she did with every overflow guest she sent to the Gaslamp Hotel due to a lack of vacancies, starting with the hotel's main entrance: take Bossk Avenue eastbound and then turn right on Glumack Drive; somewhere on that stretch of Glumack Drive, the Gaslamp Hotel sign will show up on the left if Tana continued to go in that direction. Plus it's on the corner of an intersection. Let's hope that the Gaslamp isn't full, sometimes it can be, but the Gaslamp is much, much larger than the Crown Nebula will ever be, even with all six floors I'm permitted thanks to the municipal ordinances not permitting buildings more than 20m high for commercial property, she thought, realizing the Crown Nebula will feature at most 106 rooms at this rate, but the most likely figure will be somewhere in the 90-100 room range when all six phases are completed, and the gourmet restaurant terracing would probably require two floors of terracing at that stage, with two more floors of terracing for the bar on top of it, expecting the overflow rate to decrease somewhat in the future and maybe the occupancy rate once there are enough rooms.