Bombshell Genius
IC thread
Because posting 400 posts between 7+ players for building a flagship is a grueling enterprise, and requires extensive OOC planning, I feel it was necessary to have an OOC thread to coordinate the construction and sort out all issues.
A preliminary plan:
Phase I: The Senate Armed Forces Committee (where many of our beloved tech players will testify in front of the Senate Armed Forces Committee, as the Senate Armed Forces Committee is faced with the prospect of spending several billion on the Warspite's construction)
Phase II: Planning stages (after the Senate Armed Forces Committee awards the flagship contract to the consortium made up of a number of shipwrights owned by the players)
Phase III: Materials
Phase IV: Components procurement (and design if novel components are required)
Phase V: Construction proper
Phase VI: Space trials
Phase VII: Commissioning ceremony
Currently we are at phase 1. Phase 1 objectives:
Because posting 400 posts between 7+ players for building a flagship is a grueling enterprise, and requires extensive OOC planning, I feel it was necessary to have an OOC thread to coordinate the construction and sort out all issues.
A preliminary plan:
Phase I: The Senate Armed Forces Committee (where many of our beloved tech players will testify in front of the Senate Armed Forces Committee, as the Senate Armed Forces Committee is faced with the prospect of spending several billion on the Warspite's construction)
Phase II: Planning stages (after the Senate Armed Forces Committee awards the flagship contract to the consortium made up of a number of shipwrights owned by the players)
Phase III: Materials
Phase IV: Components procurement (and design if novel components are required)
Phase V: Construction proper
Phase VI: Space trials
Phase VII: Commissioning ceremony
Currently we are at phase 1. Phase 1 objectives:
- Press the case for the construction of a flagship to the Senate Armed Services Committee
- Determine the allowable budget for its construction (if the case is successfully made for the flagship to be authorized in the first place)
- Determine the scope statement (under the same proviso)