Jedi Hotelier
Location: Silver Rest
After all these Force-lessons, after flying several combat sorties against Sith factions, such as the last one in the Roche asteroid field, Varindar came to a bleak realization: she still hasn't crafted her lightsaber. She couldn't call herself a Jedi with only a practice lightsaber, she had to get her real one at some point, before she could become a full-fledged knight. Then again, she'd rather not go get the crystal on her own, not even with a 10mm ripper, or her two drums of 120 bullets, so she asked among the padawans who would be willing to get their hands on Ruusan crystals on the eponymous planet. Thus far only [member="Vennic Graves"] answered. Regardless of that, she not only brought in her backpack her 10mm ripper, its corresponding bullets, and provisions, she also brought lightsaber components. The one extra feature she knew was a must was the bifurcating cyclical-ignition pulse given its underwater properties. She meets with Vennic before she takes the helm of the Neimoidian Yacht that was to bring in transfer personnel and their equipment to Ruusan, in addition to these two padawans and supplies for the garrison already there.
"Are you ready to get your lightsaber crystal and your lightsaber assembled? And also possibly learn a few extras at the Valley of the Jedi?" Varindar asked Vennic before proceeding to takeoff.
After all these Force-lessons, after flying several combat sorties against Sith factions, such as the last one in the Roche asteroid field, Varindar came to a bleak realization: she still hasn't crafted her lightsaber. She couldn't call herself a Jedi with only a practice lightsaber, she had to get her real one at some point, before she could become a full-fledged knight. Then again, she'd rather not go get the crystal on her own, not even with a 10mm ripper, or her two drums of 120 bullets, so she asked among the padawans who would be willing to get their hands on Ruusan crystals on the eponymous planet. Thus far only [member="Vennic Graves"] answered. Regardless of that, she not only brought in her backpack her 10mm ripper, its corresponding bullets, and provisions, she also brought lightsaber components. The one extra feature she knew was a must was the bifurcating cyclical-ignition pulse given its underwater properties. She meets with Vennic before she takes the helm of the Neimoidian Yacht that was to bring in transfer personnel and their equipment to Ruusan, in addition to these two padawans and supplies for the garrison already there.
"Are you ready to get your lightsaber crystal and your lightsaber assembled? And also possibly learn a few extras at the Valley of the Jedi?" Varindar asked Vennic before proceeding to takeoff.