KeCholo
Money Man
Day 4
(Translated)
A lot has happened since my first entry. We installed the control wiring, control panels, and inhibitors. Installing the inhibitors was a very remedial task, took several hours. We don't go outside often, in order to preserve heat, but we expect Tek-1 is gone due to the influx of rations on Day 3. Installing the wiring was very, very difficult as my hands are not equipped to handle such small objects. Qaeth and Ke'Cholo are both inexperienced electricians and thus I had to tell them what to do, step-by-step. The control panels were much easy, just unscrewing and replacing a few panels. Sleeping aroudn here isn't much of a problem. We unlocked a private quarters the belonged to the Fetts. I sleep in the bed we found there, Qaeth sleeps as he always does, standing up, and Ke'Cholo slept in the cockpit of Slave I.
-T'Chungo
(Translated)
A lot has happened since my first entry. We installed the control wiring, control panels, and inhibitors. Installing the inhibitors was a very remedial task, took several hours. We don't go outside often, in order to preserve heat, but we expect Tek-1 is gone due to the influx of rations on Day 3. Installing the wiring was very, very difficult as my hands are not equipped to handle such small objects. Qaeth and Ke'Cholo are both inexperienced electricians and thus I had to tell them what to do, step-by-step. The control panels were much easy, just unscrewing and replacing a few panels. Sleeping aroudn here isn't much of a problem. We unlocked a private quarters the belonged to the Fetts. I sleep in the bed we found there, Qaeth sleeps as he always does, standing up, and Ke'Cholo slept in the cockpit of Slave I.
-T'Chungo