Seraphina Shel'tah
Kinky Darth Pinky
Nubia.
0400
"Douglas. What's taking so long with the diagnostics? The reports are three hours overdue." Lisa yawned. It had been a long night. "For some reason the honeycombs are not activating on the secondary generator throughout the ship. There's a break somewhere." The young engineer was a brilliant mind. But if he was having trouble locating the exact problem area, then this was going to be a long day. "Well. If you need me, you know where to find me. I will reassign division two to the honeycomb project as well. That should help narrow down the time at least. I will inform Seraphina of our progress thus far."
In truth there was little she could do in the way of physical repairs, maintenance, or construction. She was the project manager, not an engineer. The only reason she had taken up the prospect was to further help the Republic. There was other things on her plate now though that required her attention. And thankfully with the lull of any invasions she could focus on the tasks here with some level of ease. Opening her datapad she looked through the number of files on hand for which would be added into the new Star Destroyer, the Bastion-class. Before settling back down she made a quick check list of things to complete before contacting the boss, [member="Seraphina Shel'tah"].
0400
"Douglas. What's taking so long with the diagnostics? The reports are three hours overdue." Lisa yawned. It had been a long night. "For some reason the honeycombs are not activating on the secondary generator throughout the ship. There's a break somewhere." The young engineer was a brilliant mind. But if he was having trouble locating the exact problem area, then this was going to be a long day. "Well. If you need me, you know where to find me. I will reassign division two to the honeycomb project as well. That should help narrow down the time at least. I will inform Seraphina of our progress thus far."
In truth there was little she could do in the way of physical repairs, maintenance, or construction. She was the project manager, not an engineer. The only reason she had taken up the prospect was to further help the Republic. There was other things on her plate now though that required her attention. And thankfully with the lull of any invasions she could focus on the tasks here with some level of ease. Opening her datapad she looked through the number of files on hand for which would be added into the new Star Destroyer, the Bastion-class. Before settling back down she made a quick check list of things to complete before contacting the boss, [member="Seraphina Shel'tah"].
- Confirm honeycomb cluster operational.
- Perform stress test and diagnostics.
- Perform secondary generator output and stress tests.
- Test operational functionality of thermal shields in conjunction with anti-concussion field.
- Perform power draw tests.