SELECT cache_value
FROM xf_permission_combination
WHERE permission_combination_id = ?
Params: 1
Run Time: 0.000222
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_permission_combination | const | PRIMARY | PRIMARY | 4 | const | 1 | |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Db/AbstractAdapter.php at line 152
- XF\Db\AbstractAdapter->fetchOne() in src/XF/PermissionCache.php at line 34
- XF\PermissionCache->getGlobalPerms() in src/XF/PermissionSet.php at line 35
- XF\PermissionSet->hasGlobalPermission() in src/XF/Entity/User.php at line 1197
- XF\Entity\User->hasPermission() in src/addons/Snog/Forms/XF/Entity/User.php at line 16
- Snog\Forms\XF\Entity\User->canViewAdvancedForms() in src/addons/Snog/Forms/Listener.php at line 131
- Snog\Forms\Listener::appPubStartEnd() in src/XF/Extension.php at line 69
- XF\Extension->fire() in src/XF/App.php at line 2853
- XF\App->fire() in src/XF/Pub/App.php at line 201
- XF\Pub\App->start() in src/XF/App.php at line 2347
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `xf_thread`.*, `xf_user_User_1`.*, `xf_snog_forms_forms_Form_2`.*, `xf_forum_Forum_3`.*, `xf_tl_group_forum_GroupForum_4`.*, `xf_node_Node_5`.*, `xf_permission_cache_content_Permissions_6`.*
FROM `xf_thread`
LEFT JOIN `xf_user` AS `xf_user_User_1` ON (`xf_user_User_1`.`user_id` = `xf_thread`.`user_id`)
LEFT JOIN `xf_snog_forms_forms` AS `xf_snog_forms_forms_Form_2` ON (`xf_snog_forms_forms_Form_2`.`oldthread` > '0' AND `xf_snog_forms_forms_Form_2`.`oldthread` = `xf_thread`.`thread_id`)
LEFT JOIN `xf_forum` AS `xf_forum_Forum_3` ON (`xf_forum_Forum_3`.`node_id` = `xf_thread`.`node_id`)
LEFT JOIN `xf_tl_group_forum` AS `xf_tl_group_forum_GroupForum_4` ON (`xf_tl_group_forum_GroupForum_4`.`node_id` = `xf_forum_Forum_3`.`node_id`)
LEFT JOIN `xf_node` AS `xf_node_Node_5` ON (`xf_node_Node_5`.`node_id` = `xf_forum_Forum_3`.`node_id`)
LEFT JOIN `xf_permission_cache_content` AS `xf_permission_cache_content_Permissions_6` ON (`xf_permission_cache_content_Permissions_6`.`content_type` = 'node' AND `xf_permission_cache_content_Permissions_6`.`content_id` = `xf_node_Node_5`.`node_id` AND `xf_permission_cache_content_Permissions_6`.`permission_combination_id` = '1')
WHERE (`xf_thread`.`thread_id` = '107333')
LIMIT 1
Run Time: 0.000929
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_thread | const | PRIMARY | PRIMARY | 4 | const | 1 | |
SIMPLE | xf_user_User_1 | const | PRIMARY | PRIMARY | 4 | const | 1 | |
SIMPLE | xf_snog_forms_forms_Form_2 | ref | oldthread | oldthread | 4 | const | 1 | Using where |
SIMPLE | xf_forum_Forum_3 | eq_ref | PRIMARY | PRIMARY | 4 | const | 1 | |
SIMPLE | xf_tl_group_forum_GroupForum_4 | eq_ref | PRIMARY | PRIMARY | 4 | admin_xen.xf_forum_Forum_3.node_id | 1 | Using where |
SIMPLE | xf_node_Node_5 | eq_ref | PRIMARY | PRIMARY | 4 | admin_xen.xf_forum_Forum_3.node_id | 1 | Using where |
SIMPLE | xf_permission_cache_content_Permissions_6 | eq_ref | PRIMARY | PRIMARY | 35 | const,const,admin_xen.xf_node_Node_5.node_id | 1 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/XF/Mvc/Entity/Manager.php at line 151
- XF\Mvc\Entity\Manager->find() in src/XF/Pub/Controller/Thread.php at line 1717
- XF\Pub\Controller\Thread->assertViewableThread() in src/XF/Pub/Controller/Thread.php at line 17
- XF\Pub\Controller\Thread->actionIndex() in src/addons/Snog/Actions/XF/Pub/Controller/Thread.php at line 11
- Snog\Actions\XF\Pub\Controller\Thread->actionIndex() in src/addons/Snog/Forms/XF/Pub/Controller/Thread.php at line 12
- Snog\Forms\XF\Pub\Controller\Thread->actionIndex() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 11
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `xf_post`.*, `xf_user_User_1`.*, `xf_user_option_Option_2`.*, `xf_user_profile_Profile_3`.*, `xf_user_privacy_Privacy_4`.*, `xf_permission_combination_PermissionCombination_5`.*, `xf_session_activity_Activity_6`.*, `xf_sv_content_mentions_Mentions_7`.*, `xf_snog_forms_promotions_Promotions_8`.*
FROM `xf_post`
LEFT JOIN `xf_user` AS `xf_user_User_1` ON (`xf_user_User_1`.`user_id` = `xf_post`.`user_id`)
LEFT JOIN `xf_user_option` AS `xf_user_option_Option_2` ON (`xf_user_option_Option_2`.`user_id` = `xf_user_User_1`.`user_id`)
LEFT JOIN `xf_user_profile` AS `xf_user_profile_Profile_3` ON (`xf_user_profile_Profile_3`.`user_id` = `xf_user_User_1`.`user_id`)
LEFT JOIN `xf_user_privacy` AS `xf_user_privacy_Privacy_4` ON (`xf_user_privacy_Privacy_4`.`user_id` = `xf_user_User_1`.`user_id`)
LEFT JOIN `xf_permission_combination` AS `xf_permission_combination_PermissionCombination_5` ON (`xf_permission_combination_PermissionCombination_5`.`permission_combination_id` = `xf_user_User_1`.`permission_combination_id`)
LEFT JOIN `xf_session_activity` AS `xf_session_activity_Activity_6` ON (`xf_session_activity_Activity_6`.`user_id` = `xf_user_User_1`.`user_id` AND `xf_session_activity_Activity_6`.`unique_key` = CONCAT(`xf_user_User_1`.`user_id`, ''))
LEFT JOIN `xf_sv_content_mentions` AS `xf_sv_content_mentions_Mentions_7` ON (`xf_sv_content_mentions_Mentions_7`.`content_type` = 'post' AND `xf_sv_content_mentions_Mentions_7`.`content_id` = `xf_post`.`post_id`)
LEFT JOIN `xf_snog_forms_promotions` AS `xf_snog_forms_promotions_Promotions_8` ON (`xf_snog_forms_promotions_Promotions_8`.`post_id` = `xf_post`.`post_id`)
WHERE (`xf_post`.`thread_id` = 107333) AND ((`xf_post`.`message_state` IN ('visible'))) AND (`xf_post`.`position` >= 0) AND (`xf_post`.`position` < 20)
ORDER BY `xf_post`.`position` ASC, `xf_post`.`post_date` ASC
Run Time: 0.003849
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_post | range | thread_id_post_date,thread_id_position,thread_id_score_date | thread_id_position | 8 | | 4 | Using index condition; Using where; Using filesort |
SIMPLE | xf_user_User_1 | eq_ref | PRIMARY | PRIMARY | 4 | admin_xen.xf_post.user_id | 1 | |
SIMPLE | xf_user_option_Option_2 | eq_ref | PRIMARY | PRIMARY | 4 | admin_xen.xf_user_User_1.user_id | 1 | Using where |
SIMPLE | xf_user_profile_Profile_3 | eq_ref | PRIMARY | PRIMARY | 4 | admin_xen.xf_user_User_1.user_id | 1 | Using where |
SIMPLE | xf_user_privacy_Privacy_4 | eq_ref | PRIMARY | PRIMARY | 4 | admin_xen.xf_user_User_1.user_id | 1 | Using where |
SIMPLE | xf_permission_combination_PermissionCombination_5 | eq_ref | PRIMARY | PRIMARY | 4 | admin_xen.xf_user_User_1.permission_combination_id | 1 | Using where |
SIMPLE | xf_session_activity_Activity_6 | eq_ref | PRIMARY | PRIMARY | 22 | admin_xen.xf_user_User_1.user_id,func | 1 | Using where |
SIMPLE | xf_sv_content_mentions_Mentions_7 | eq_ref | PRIMARY | PRIMARY | 31 | const,admin_xen.xf_post.post_id | 1 | Using where |
SIMPLE | xf_snog_forms_promotions_Promotions_8 | eq_ref | post_id | post_id | 4 | admin_xen.xf_post.post_id | 1 | |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/XF/Pub/Controller/Thread.php at line 65
- XF\Pub\Controller\Thread->actionIndex() in src/addons/Snog/Actions/XF/Pub/Controller/Thread.php at line 11
- Snog\Actions\XF\Pub\Controller\Thread->actionIndex() in src/addons/Snog/Forms/XF/Pub/Controller/Thread.php at line 12
- Snog\Forms\XF\Pub\Controller\Thread->actionIndex() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 11
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `xf_dbtech_credits_event`.*
FROM `xf_dbtech_credits_event`
WHERE (`xf_dbtech_credits_event`.`event_trigger_id` = 'read')
Run Time: 0.000149
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_dbtech_credits_event | ALL | | | | | 15 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/addons/DBTech/Credits/EventTrigger/AbstractHandler.php at line 174
- DBTech\Credits\EventTrigger\AbstractHandler->getEvents() in src/addons/DBTech/Credits/EventTrigger/AbstractHandler.php at line 204
- DBTech\Credits\EventTrigger\AbstractHandler->getApplicableEvents() in src/addons/DBTech/Credits/EventTrigger/AbstractHandler.php at line 503
- DBTech\Credits\EventTrigger\AbstractHandler->trigger() in src/addons/DBTech/Credits/EventTrigger/AbstractHandler.php at line 431
- DBTech\Credits\EventTrigger\AbstractHandler->apply() in src/addons/DBTech/Credits/XF/Repository/Thread.php at line 21
- DBTech\Credits\XF\Repository\Thread->logThreadView() in src/XF/Pub/Controller/Thread.php at line 141
- XF\Pub\Controller\Thread->actionIndex() in src/addons/Snog/Actions/XF/Pub/Controller/Thread.php at line 11
- Snog\Actions\XF\Pub\Controller\Thread->actionIndex() in src/addons/Snog/Forms/XF/Pub/Controller/Thread.php at line 12
- Snog\Forms\XF\Pub\Controller\Thread->actionIndex() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 11
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `xf_dbtech_credits_event`.*
FROM `xf_dbtech_credits_event`
WHERE (`xf_dbtech_credits_event`.`event_trigger_id` = 'view')
Run Time: 0.000120
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_dbtech_credits_event | ALL | | | | | 15 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/addons/DBTech/Credits/EventTrigger/AbstractHandler.php at line 174
- DBTech\Credits\EventTrigger\AbstractHandler->getEvents() in src/addons/DBTech/Credits/EventTrigger/AbstractHandler.php at line 204
- DBTech\Credits\EventTrigger\AbstractHandler->getApplicableEvents() in src/addons/DBTech/Credits/EventTrigger/AbstractHandler.php at line 503
- DBTech\Credits\EventTrigger\AbstractHandler->trigger() in src/addons/DBTech/Credits/EventTrigger/View.php at line 34
- DBTech\Credits\EventTrigger\View->trigger() in src/addons/DBTech/Credits/EventTrigger/AbstractHandler.php at line 431
- DBTech\Credits\EventTrigger\AbstractHandler->apply() in src/addons/DBTech/Credits/XF/Repository/Thread.php at line 37
- DBTech\Credits\XF\Repository\Thread->logThreadView() in src/XF/Pub/Controller/Thread.php at line 141
- XF\Pub\Controller\Thread->actionIndex() in src/addons/Snog/Actions/XF/Pub/Controller/Thread.php at line 11
- Snog\Actions\XF\Pub\Controller\Thread->actionIndex() in src/addons/Snog/Forms/XF/Pub/Controller/Thread.php at line 12
- Snog\Forms\XF\Pub\Controller\Thread->actionIndex() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 11
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_user_moods`.*
FROM `swrp_user_moods`
WHERE (`swrp_user_moods`.`user_id` = 13824)
LIMIT 1
Run Time: 0.000153
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_user_moods | ALL | | | | | 8050 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 13
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`mood_id` IN ('23', '35', '94'))
ORDER BY `swrp_moods`.`title` ASC
Run Time: 0.000094
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | range | PRIMARY | PRIMARY | 4 | | 3 | Using where; Using filesort |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 27
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`default` = 1)
LIMIT 1
Run Time: 0.000087
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | ALL | | | | | 1052 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/Moods.php at line 36
- SwrpChaos\XenMoods\Repository\Moods->getDefaultMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 19
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_user_moods`.*
FROM `swrp_user_moods`
WHERE (`swrp_user_moods`.`user_id` = 14003)
LIMIT 1
Run Time: 0.001906
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_user_moods | ALL | | | | | 8050 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 13
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`default` = 1)
Run Time: 0.000383
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | ALL | | | | | 1052 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 23
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`default` = 1)
LIMIT 1
Run Time: 0.000098
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | ALL | | | | | 1052 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/Moods.php at line 36
- SwrpChaos\XenMoods\Repository\Moods->getDefaultMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 19
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_user_moods`.*
FROM `swrp_user_moods`
WHERE (`swrp_user_moods`.`user_id` = 13824)
LIMIT 1
Run Time: 0.000131
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_user_moods | ALL | | | | | 8050 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 13
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`mood_id` IN ('23', '35', '94'))
ORDER BY `swrp_moods`.`title` ASC
Run Time: 0.000077
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | range | PRIMARY | PRIMARY | 4 | | 3 | Using where; Using filesort |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 27
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`default` = 1)
LIMIT 1
Run Time: 0.000077
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | ALL | | | | | 1052 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/Moods.php at line 36
- SwrpChaos\XenMoods\Repository\Moods->getDefaultMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 19
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_user_moods`.*
FROM `swrp_user_moods`
WHERE (`swrp_user_moods`.`user_id` = 14003)
LIMIT 1
Run Time: 0.001875
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_user_moods | ALL | | | | | 8050 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 13
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`default` = 1)
Run Time: 0.000386
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | ALL | | | | | 1052 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 23
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`default` = 1)
LIMIT 1
Run Time: 0.000082
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | ALL | | | | | 1052 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/Moods.php at line 36
- SwrpChaos\XenMoods\Repository\Moods->getDefaultMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 19
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_user_moods`.*
FROM `swrp_user_moods`
WHERE (`swrp_user_moods`.`user_id` = 13824)
LIMIT 1
Run Time: 0.000126
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_user_moods | ALL | | | | | 8050 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 13
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`mood_id` IN ('23', '35', '94'))
ORDER BY `swrp_moods`.`title` ASC
Run Time: 0.000083
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | range | PRIMARY | PRIMARY | 4 | | 3 | Using where; Using filesort |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/addons/SwrpChaos/XenMoods/Repository/UserMoods.php at line 27
- SwrpChaos\XenMoods\Repository\UserMoods->getUserMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 18
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `swrp_moods`.*
FROM `swrp_moods`
WHERE (`swrp_moods`.`default` = 1)
LIMIT 1
Run Time: 0.000088
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | swrp_moods | ALL | | | | | 1052 | Using where |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/addons/SwrpChaos/XenMoods/Repository/Moods.php at line 36
- SwrpChaos\XenMoods\Repository\Moods->getDefaultMood() in src/addons/SwrpChaos/XenMoods/Extend/Pub/Controller/Thread.php at line 19
- SwrpChaos\XenMoods\Extend\Pub\Controller\Thread->actionIndex() in src/addons/Truonglv/Groups/XF/Pub/Controller/Thread.php at line 35
- Truonglv\Groups\XF\Pub\Controller\Thread->actionIndex() in src/addons/XenAddons/AMS/XF/Pub/Controller/Thread.php at line 11
- XenAddons\AMS\XF\Pub\Controller\Thread->actionIndex() in src/addons/XFA/TrophiesEnhancement/XF/Pub/Controller/Thread.php at line 20
- XFA\TrophiesEnhancement\XF\Pub\Controller\Thread->actionIndex() in src/addons/cv6/DiceRoller/XF/Pub/Controller/Thread.php at line 13
- cv6\DiceRoller\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserActivity/XF/Pub/Controller/Thread.php at line 15
- SV\UserActivity\XF\Pub\Controller\Thread->actionIndex() in src/addons/SV/UserEssentials/XF/Pub/Controller/Thread.php at line 31
- SV\UserEssentials\XF\Pub\Controller\Thread->actionIndex() in src/XF/Mvc/Dispatcher.php at line 352
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT view_date
FROM xf_session_activity
WHERE user_id = ? AND unique_key = ?
Params: 0,
Run Time: 0.000081
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_session_activity | const | PRIMARY | PRIMARY | 22 | const,const | 1 | |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Db/AbstractAdapter.php at line 152
- XF\Db\AbstractAdapter->fetchOne() in src/XF/Repository/SessionActivity.php at line 134
- XF\Repository\SessionActivity->updateSessionActivity() in src/addons/xenMade/LAU/XF/Repository/SessionActivity.php at line 16
- xenMade\LAU\XF\Repository\SessionActivity->updateSessionActivity() in src/addons/SV/UserActivity/XF/Repository/SessionActivity.php at line 39
- SV\UserActivity\XF\Repository\SessionActivity->updateSessionActivity() in src/XF/Pub/Controller/AbstractController.php at line 84
- XF\Pub\Controller\AbstractController->updateSessionActivity() in src/XF/Pub/Controller/AbstractController.php at line 44
- XF\Pub\Controller\AbstractController->postDispatchType() in src/addons/SV/UserActivity/UserCountActivityInjector.php at line 27
- SV\UserActivity\XF\Pub\Controller\Thread->postDispatchType() in src/XF/Mvc/Controller.php at line 289
- XF\Mvc\Controller->postDispatch() in src/addons/SV/UserActivity/UserActivityInjector.php at line 71
- SV\UserActivity\XF\Pub\Controller\Thread->postDispatch() in src/XF/Mvc/Dispatcher.php at line 385
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
-- XFDB=noForceAllWrite
UPDATE xf_session_activity
SET
ip = ?,
controller_name = ?,
controller_action = ?,
view_state = ?,
params = ?,
view_date = ?,
robot_key = ?
WHERE user_id = ? AND unique_key = ?
Params: , XF\Pub\Controller\Thread, Index, valid, thread_id=107333, 1714690588, , 0,
Run Time: 0.000074
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Repository/SessionActivity.php at line 227
- XF\Repository\SessionActivity->updateSessionActivity() in src/addons/xenMade/LAU/XF/Repository/SessionActivity.php at line 16
- xenMade\LAU\XF\Repository\SessionActivity->updateSessionActivity() in src/addons/SV/UserActivity/XF/Repository/SessionActivity.php at line 39
- SV\UserActivity\XF\Repository\SessionActivity->updateSessionActivity() in src/XF/Pub/Controller/AbstractController.php at line 84
- XF\Pub\Controller\AbstractController->updateSessionActivity() in src/XF/Pub/Controller/AbstractController.php at line 44
- XF\Pub\Controller\AbstractController->postDispatchType() in src/addons/SV/UserActivity/UserCountActivityInjector.php at line 27
- SV\UserActivity\XF\Pub\Controller\Thread->postDispatchType() in src/XF/Mvc/Controller.php at line 289
- XF\Mvc\Controller->postDispatch() in src/addons/SV/UserActivity/UserActivityInjector.php at line 71
- SV\UserActivity\XF\Pub\Controller\Thread->postDispatch() in src/XF/Mvc/Dispatcher.php at line 385
- XF\Mvc\Dispatcher->dispatchClass() in src/XF/Mvc/Dispatcher.php at line 259
- XF\Mvc\Dispatcher->dispatchFromMatch() in src/XF/Mvc/Dispatcher.php at line 115
- XF\Mvc\Dispatcher->dispatchLoop() in src/XF/Mvc/Dispatcher.php at line 57
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `xf_cv6_dice`.*
FROM `xf_cv6_dice`
WHERE (`xf_cv6_dice`.`active` = '1')
ORDER BY `xf_cv6_dice`.`display_order` ASC
Run Time: 0.000106
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_cv6_dice | ALL | | | | | 6 | Using where; Using filesort |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/addons/cv6/DiceRoller/Repository/Dice.php at line 50
- cv6\DiceRoller\Repository\Dice->getDiceForThreadView() in src/addons/cv6/DiceRoller/Listener.php at line 85
- cv6\DiceRoller\Listener::globalTemplateData() in src/XF/Extension.php at line 69
- XF\Extension->fire() in src/XF/App.php at line 2853
- XF\App->fire() in src/XF/App.php at line 2076
- XF\App->getGlobalTemplateData() in src/XF/App.php at line 1946
- XF\App->preRender() in src/XF/Pub/App.php at line 450
- XF\Pub\App->preRender() in src/XF/Mvc/Dispatcher.php at line 397
- XF\Mvc\Dispatcher->render() in src/XF/Mvc/Dispatcher.php at line 60
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `xf_session_activity`.*
FROM `xf_session_activity`
WHERE (`xf_session_activity`.`user_id` = 13824) AND (`xf_session_activity`.`unique_key` = '13824')
LIMIT 1
Run Time: 0.000083
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | | | | | | | | Impossible WHERE noticed after reading const tables |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1354
- XF\Mvc\Entity\Finder->fetchOne() in src/XF/Mvc/Entity/Manager.php at line 151
- XF\Mvc\Entity\Manager->find() in src/XF/Mvc/Entity/Manager.php at line 359
- XF\Mvc\Entity\Manager->getRelation() in src/XF/Mvc/Entity/Entity.php at line 397
- XF\Mvc\Entity\Entity->getRelation() in src/XF/Mvc/Entity/Entity.php at line 189
- XF\Mvc\Entity\Entity->get() in src/XF/Mvc/Entity/Entity.php at line 112
- XF\Mvc\Entity\Entity->__get() in src/XF/Entity/User.php at line 312
- XF\Entity\User->getLastActivity() in src/XF/Mvc/Entity/Entity.php at line 160
- XF\Mvc\Entity\Entity->get() in src/XF/Mvc/Entity/Entity.php at line 112
- XF\Mvc\Entity\Entity->__get() in src/XF/Entity/User.php at line 521
- XF\Entity\User->canViewOnlineStatus() in src/XF/Entity/User.php at line 240
- XF\Entity\User->isOnline() in src/XF/Template/Templater.php at line 1191
- XF\Template\Templater->method() in internal_data/code_cache/templates/l1/s8/public/message_macros.php at line 78
- XF\Template\Templater->{closure}() in src/XF/Template/Templater.php at line 824
- XF\Template\Templater->callMacro() in internal_data/code_cache/templates/l1/s8/public/post_macros.php at line 26
- XF\Template\Templater->{closure}() in src/XF/Template/Templater.php at line 987
- XF\Template\Templater->renderExtensionInternal() in src/XF/Template/Templater.php at line 923
- XF\Template\Templater->renderExtension() in internal_data/code_cache/templates/l1/s8/public/post_macros.php at line 149
- XF\Template\Templater->{closure}() in src/XF/Template/Templater.php at line 987
- XF\Template\Templater->renderExtensionInternal() in src/XF/Template/Templater.php at line 923
- XF\Template\Templater->renderExtension() in internal_data/code_cache/templates/l1/s8/public/post_macros.php at line 193
- XF\Template\Templater->{closure}() in src/XF/Template/Templater.php at line 824
- XF\Template\Templater->callMacro() in internal_data/code_cache/templates/l1/s8/public/thread_view.php at line 854
- XF\Template\Templater->{closure}() in src/XF/Template/Templater.php at line 1651
- XF\Template\Templater->renderTemplate() in src/XF/Template/Template.php at line 24
- XF\Template\Template->render() in src/XF/Mvc/Renderer/Html.php at line 50
- XF\Mvc\Renderer\Html->renderView() in src/XF/Mvc/Dispatcher.php at line 460
- XF\Mvc\Dispatcher->renderView() in src/XF/Mvc/Dispatcher.php at line 442
- XF\Mvc\Dispatcher->renderReply() in src/XF/Mvc/Dispatcher.php at line 402
- XF\Mvc\Dispatcher->render() in src/XF/Mvc/Dispatcher.php at line 60
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `xf_node`.*, `xf_permission_cache_content_Permissions_1`.*
FROM `xf_node`
LEFT JOIN `xf_permission_cache_content` AS `xf_permission_cache_content_Permissions_1` ON (`xf_permission_cache_content_Permissions_1`.`content_type` = 'node' AND `xf_permission_cache_content_Permissions_1`.`content_id` = `xf_node`.`node_id` AND `xf_permission_cache_content_Permissions_1`.`permission_combination_id` = '1')
WHERE (`xf_node`.`node_id` IN (184))
Run Time: 0.000186
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_node | const | PRIMARY | PRIMARY | 4 | const | 1 | |
SIMPLE | xf_permission_cache_content_Permissions_1 | const | PRIMARY | PRIMARY | 35 | const,const,const | 1 | |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/XF/Mvc/Entity/Manager.php at line 214
- XF\Mvc\Entity\Manager->findByIds() in src/XF/Navigation/NodeType.php at line 215
- XF\Navigation\NodeType::loadPendingNodeData() in src/XF/Navigation/NodeType.php at line 133
- XF\Navigation\NodeType::displayNodeExtended() in internal_data/code_cache/navigation_cache.php at line 949
- XF\Pub\App->{closure}() in src/XF/Template/Templater.php at line 7491
- XF\Template\Templater->renderNavigationClosure() in src/XF/Pub/App.php at line 577
- XF\Pub\App->getNavigation() in src/XF/Pub/App.php at line 528
- XF\Pub\App->renderPageHtml() in src/XF/App.php at line 2149
- XF\App->renderPage() in src/XF/Mvc/Dispatcher.php at line 404
- XF\Mvc\Dispatcher->render() in src/XF/Mvc/Dispatcher.php at line 60
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
SELECT `xf_page`.*, `xf_node_Node_1`.*
FROM `xf_page`
LEFT JOIN `xf_node` AS `xf_node_Node_1` ON (`xf_node_Node_1`.`node_id` = `xf_page`.`node_id`)
WHERE (`xf_page`.`node_id` IN (184))
Run Time: 0.000148
Select Type | Table | Type | Possible Keys | Key | Key Len | Ref | Rows | Extra |
---|
SIMPLE | xf_page | const | PRIMARY | PRIMARY | 4 | const | 1 | |
SIMPLE | xf_node_Node_1 | const | PRIMARY | PRIMARY | 4 | const | 1 | |
- XF\Db\Mysqli\Statement->execute() in src/XF/Db/AbstractAdapter.php at line 96
- XF\Db\AbstractAdapter->query() in src/XF/Mvc/Entity/Finder.php at line 1387
- XF\Mvc\Entity\Finder->fetch() in src/XF/Mvc/Entity/Manager.php at line 214
- XF\Mvc\Entity\Manager->findByIds() in src/XF/Repository/Node.php at line 146
- XF\Repository\Node->loadNodeTypeDataForNodes() in src/addons/SV/OptimizedListQueries/XF/Repository/Node.php at line 77
- SV\OptimizedListQueries\XF\Repository\Node->loadNodeTypeDataForNodes() in src/addons/Truonglv/Groups/XF/Repository/Node.php at line 24
- Truonglv\Groups\XF\Repository\Node->loadNodeTypeDataForNodes() in src/XF/Navigation/NodeType.php at line 254
- XF\Navigation\NodeType::loadPendingNodeData() in src/XF/Navigation/NodeType.php at line 133
- XF\Navigation\NodeType::displayNodeExtended() in internal_data/code_cache/navigation_cache.php at line 949
- XF\Pub\App->{closure}() in src/XF/Template/Templater.php at line 7491
- XF\Template\Templater->renderNavigationClosure() in src/XF/Pub/App.php at line 577
- XF\Pub\App->getNavigation() in src/XF/Pub/App.php at line 528
- XF\Pub\App->renderPageHtml() in src/XF/App.php at line 2149
- XF\App->renderPage() in src/XF/Mvc/Dispatcher.php at line 404
- XF\Mvc\Dispatcher->render() in src/XF/Mvc/Dispatcher.php at line 60
- XF\Mvc\Dispatcher->run() in src/XF/App.php at line 2351
- XF\App->run() in src/XF.php at line 517
- XF::runApp() in index.php at line 20
bytes_sent | 16333 |
bytes_received | 209272 |
packets_sent | 310 |
packets_received | 1779 |
protocol_overhead_in | 7116 |
protocol_overhead_out | 1240 |
bytes_received_ok_packet | 0 |
bytes_received_eof_packet | 0 |
bytes_received_rset_header_packet | 720 |
bytes_received_rset_field_meta_packet | 0 |
bytes_received_rset_row_packet | 324 |
bytes_received_prepare_response_packet | 115942 |
bytes_received_change_user_packet | 91123 |
packets_sent_command | 154 |
packets_received_ok | 0 |
packets_received_eof | 0 |
packets_received_rset_header | 80 |
packets_received_rset_field_meta | 0 |
packets_received_rset_row | 53 |
packets_received_prepare_response | 1467 |
packets_received_change_user | 126 |
result_set_queries | 50 |
non_result_set_queries | 3 |
no_index_used | 15 |
bad_index_used | 0 |
slow_queries | 0 |
buffered_sets | 0 |
unbuffered_sets | 0 |
ps_buffered_sets | 50 |
ps_unbuffered_sets | 0 |
flushed_normal_sets | 0 |
flushed_ps_sets | 0 |
ps_prepared_never_executed | 0 |
ps_prepared_once_executed | 50 |
rows_fetched_from_server_normal | 0 |
rows_fetched_from_server_ps | 76 |
rows_buffered_from_client_normal | 0 |
rows_buffered_from_client_ps | 76 |
rows_fetched_from_client_normal_buffered | 0 |
rows_fetched_from_client_normal_unbuffered | 0 |
rows_fetched_from_client_ps_buffered | 0 |
rows_fetched_from_client_ps_unbuffered | 0 |
rows_fetched_from_client_ps_cursor | 0 |
rows_affected_normal | 0 |
rows_affected_ps | 0 |
rows_skipped_normal | 0 |
rows_skipped_ps | 76 |
copy_on_write_saved | 0 |
copy_on_write_performed | 0 |
command_buffer_too_small | 0 |
connect_success | 1 |
connect_failure | 0 |
connection_reused | 0 |
reconnect | 0 |
pconnect_success | 1 |
active_connections | 1 |
active_persistent_connections | 1 |
explicit_close | 0 |
implicit_close | 0 |
disconnect_close | 0 |
in_middle_of_command_close | 0 |
explicit_free_result | 0 |
implicit_free_result | 0 |
explicit_stmt_close | 0 |
implicit_stmt_close | 0 |
mem_emalloc_count | 0 |
mem_emalloc_amount | 0 |
mem_ecalloc_count | 0 |
mem_ecalloc_amount | 0 |
mem_erealloc_count | 0 |
mem_erealloc_amount | 0 |
mem_efree_count | 0 |
mem_efree_amount | 0 |
mem_malloc_count | 0 |
mem_malloc_amount | 0 |
mem_calloc_count | 0 |
mem_calloc_amount | 0 |
mem_realloc_count | 0 |
mem_realloc_amount | 0 |
mem_free_count | 0 |
mem_free_amount | 0 |
mem_estrndup_count | 0 |
mem_strndup_count | 0 |
mem_estrdup_count | 0 |
mem_strdup_count | 0 |
mem_edupl_count | 0 |
mem_dupl_count | 0 |
proto_text_fetched_null | 0 |
proto_text_fetched_bit | 0 |
proto_text_fetched_tinyint | 0 |
proto_text_fetched_short | 0 |
proto_text_fetched_int24 | 0 |
proto_text_fetched_int | 0 |
proto_text_fetched_bigint | 0 |
proto_text_fetched_decimal | 0 |
proto_text_fetched_float | 0 |
proto_text_fetched_double | 0 |
proto_text_fetched_date | 0 |
proto_text_fetched_year | 0 |
proto_text_fetched_time | 0 |
proto_text_fetched_datetime | 0 |
proto_text_fetched_timestamp | 0 |
proto_text_fetched_string | 0 |
proto_text_fetched_blob | 0 |
proto_text_fetched_enum | 0 |
proto_text_fetched_set | 0 |
proto_text_fetched_geometry | 0 |
proto_text_fetched_other | 0 |
proto_binary_fetched_null | 0 |
proto_binary_fetched_bit | 355 |
proto_binary_fetched_tinyint | 0 |
proto_binary_fetched_short | 154 |
proto_binary_fetched_int24 | 48 |
proto_binary_fetched_int | 0 |
proto_binary_fetched_bigint | 409 |
proto_binary_fetched_decimal | 81 |
proto_binary_fetched_float | 13 |
proto_binary_fetched_double | 0 |
proto_binary_fetched_date | 0 |
proto_binary_fetched_year | 0 |
proto_binary_fetched_time | 0 |
proto_binary_fetched_datetime | 0 |
proto_binary_fetched_timestamp | 0 |
proto_binary_fetched_string | 0 |
proto_binary_fetched_json | 501 |
proto_binary_fetched_blob | 102 |
proto_binary_fetched_enum | 0 |
proto_binary_fetched_set | 0 |
proto_binary_fetched_geometry | 0 |
proto_binary_fetched_other | 0 |
init_command_executed_count | 0 |
init_command_failed_count | 0 |
com_quit | 0 |
com_init_db | 0 |
com_query | 2 |
com_field_list | 0 |
com_create_db | 0 |
com_drop_db | 0 |
com_refresh | 0 |
com_shutdown | 0 |
com_statistics | 0 |
com_process_info | 0 |
com_connect | 0 |
com_process_kill | 0 |
com_debug | 0 |
com_ping | 0 |
com_time | 0 |
com_delayed_insert | 0 |
com_change_user | 0 |
com_binlog_dump | 0 |
com_table_dump | 0 |
com_connect_out | 0 |
com_register_slave | 0 |
com_stmt_prepare | 51 |
com_stmt_execute | 51 |
com_stmt_send_long_data | 0 |
com_stmt_close | 50 |
com_stmt_reset | 0 |
com_stmt_set_option | 0 |
com_stmt_fetch | 0 |
com_deamon | 0 |
bytes_received_real_data_normal | 0 |
bytes_received_real_data_ps | 89632 |